Testing & Validation · Semiconductor

Semiconductor Testing Services: Validation, Characterization and ATE

Stalwart Innovations provides semiconductor testing services from Bengaluru, India: post-silicon validation, characterization across process, voltage and temperature, ATE test program development on Advantest V93000 and Teradyne UltraFLEX and J750, board-level and system-level test, and test time reduction. Engineers work in your lab, on your tester or with your OSAT.

What we deliver

Post-silicon validation

Bring-up, functional and electrical validation, and PCIe, DDR/LPDDR, USB and MIPI interface validation. Detail on post-silicon validation.

Characterization

Shmoo plots, parametric sweeps and margin tests across PVT corners and material lots, with datasheet limits and guard-bands proposed from the data.

ATE test programs

Test plans, pattern conversion from ATPG and simulation, program development and debug in SmarTest or IG-XL, and release to production. See ATE test engineering.

Board-level and system-level test

Validation and evaluation board test, IEEE 1149.1 boundary scan, IEEE 1687 instrument access, and system-level test with real software loads. See board bring-up.

Test time reduction

Profiling test flows, multi-site and concurrent test, removing tests with no fallout using STDF history, and re-correlating after each change.

OSAT and ATMP test engineering

Program transfer, tester-to-tester correlation, yield and bin analysis, and production support alongside your OSAT's test floor.

Validation, characterization and production test

ActivityPurposeWhere it runsTypical output
Post-silicon validationProve the silicon meets its specification under real conditionsLab benches with instruments, evaluation boards and software stimulusValidation report, errata, root-cause analysis
CharacterizationMeasure parameter distributions across PVT corners and lotsBench and ATE with temperature forcingCharacterization report, proposed datasheet limits
Production test (ATE)Screen every die or package for manufacturing defectsWafer probe and final test on V93000, UltraFLEX or J750Released test program, STDF data, yield and bin reports
System-level testCatch defects structural tests miss, under real workloadsSLT handlers or system boardsSLT program, failure analysis data

How we work

01

Join before tape-out

Review the validation plan, DFT architecture and test plan, so boards, load boards and probe cards are ready for first silicon.

02

Bring up and validate

Bring up first silicon, run the validation plan and log bugs with root-cause evidence for design and firmware teams.

03

Characterize

Sweep parameters across PVT corners and material lots, and propose test limits from the data.

04

Develop and correlate programs

Build the ATE program, correlate bench to tester and site to site, and release to the OSAT.

05

Support production

Analyse STDF yield data, reduce test time and maintain the program through silicon and package revisions.

India's assembly and test build-out

Assembly and test capacity in India is growing. Micron's ATMP plant at Sanand, an assembly and test facility rather than a wafer fab, was inaugurated on 28 February 2026, as reported by Morung Express. The Union Cabinet approved Semicon 2.0 on 15 July 2026 with an outlay of ₹1,27,500 crore, and ATMP/OSAT is one of its six pillars, according to Inc42 and the Prime Minister's Office.

Each new test floor needs ATE program developers, product and yield engineers and reliability engineers. Our work is test engineering, not test-floor infrastructure: engineers work on your testers, in your validation lab or with your OSAT. Background reading: ATE, post-silicon validation, DFT and semiconductor talent.

Toolchains our engineers work with

  • Advantest SmarTest
  • Advantest T2000
  • Advantest V93000
  • JMP
  • NI PXI
  • NI TestStand
  • Python
  • PyVISA
  • Teradyne IG-XL
  • Teradyne J750
  • Teradyne UltraFLEX

Related work

Case studies →

Further reading

All insights →

Frequently asked questions

What is post-silicon validation versus production test?

Post-silicon validation checks that a new design works as specified, using lab benches, instruments and real software on a small number of parts. Production test on ATE screens every manufactured part for defects in seconds, using structural and parametric tests built on the DFT. Validation finds design bugs; production test finds manufacturing defects.

What is ATE test program development, and how is test time reduced?

It is writing the program the tester runs: pin and timing setup, patterns converted from ATPG and simulation, parametric and functional tests, binning and datalogs. Test time is reduced by multi-site and concurrent test, reordering so failing parts fail early, removing tests with no fallout in STDF history and shortening settling times, each change re-correlated before release.

Which ATE platforms do your engineers work on?

Mainly Advantest V93000 with SmarTest and Teradyne UltraFLEX and J750 with IG-XL, the platforms most often named in Indian test job ads. Engineers also work with Advantest T2000 and with bench automation in Python and NI TestStand. Name your platform and software version at scoping so engineers are matched to it.

Do you need access to our tester or lab?

For execution, yes. Program development, pattern conversion and offline work can start without one, but correlation, characterization and release need tester time and real hardware. Engineers work in your lab, at your OSAT or remotely through a secured connection where your IT policy allows, so programs and data stay under your control.

Can you work with our OSAT?

Yes. Typical work is program transfer and release to the OSAT, correlation between your reference tester and theirs, probe card and load board issue handling, and yield and bin analysis from STDF data. Engineers can be placed near the OSAT during ramp-up, which matters as new ATMP capacity comes up in Gujarat and elsewhere in India.

When should validation and test engineers join a programme?

Before tape-out. Validation engineers need time to write the plan, review boards and build automation; test engineers need DFT and ATPG outputs to start the program and to specify load boards and probe cards. Joining at first silicon usually means the first weeks go on infrastructure rather than finding bugs.

Can we hire semiconductor test engineers on contract?

Yes. We recruit post-silicon validation, characterization, ATE and product engineers on contract, contract-to-hire or permanent terms. See semiconductor engineers for role profiles and screening, or semiconductor talent for how test and validation skills map to roles.

Tell us your domain, standard and team size — get a scoped brief in 2 minutes.