Testing & Validation · Managed Testing

Managed Testing Services for Embedded Products

Our managed testing services for embedded products put a Stalwart-run test team against an agreed scope, service levels and reporting. We own test planning, staffing, execution, automation upkeep and defect reporting, and scale the team up or down with your release cycle. You manage outcomes and acceptance, not individual engineers' daily tasks.

What we deliver

Statement of work and service levels

Scope, test levels, environments, entry and exit criteria, turnaround per release and reporting cadence, agreed before the team starts.

A staffed and led team

A test lead plus engineers matched to your stack, such as HIL, automation, diagnostics or validation, with handover plans for key roles.

Release test execution

Smoke, regression and feature campaigns for each software drop, with results reported against the agreed exit criteria.

Automation upkeep

Test suites and bench automation maintained as the product changes, so regression time stays predictable.

Reporting and metrics

Per-release test reports, defect trends, requirements coverage and automation status, in your ALM and a regular governance pack.

Ramp plans

Agreed lead times for scaling the team up for release peaks and back down between them.

Managed testing compared with staff augmentation

AspectManaged testingStaff augmentation
Who directs daily workStalwart test leadYour managers
What you buyAgreed test outcomes and reportsEngineer time and skills
ProcessAgreed test process, aligned with yoursYour process
Team size changesPlanned by Stalwart against your release calendarRequested by you, engineer by engineer
Best forRecurring release testing with a stable scopeFilling skill gaps inside your own team

How we work

01

Transition

Assess current tests, benches and tools, shadow your team and take over in stages.

02

Agree governance

Set service levels, reporting, escalation and change control for scope and team size.

03

Run releases

Plan and execute campaigns for each software drop and report against exit criteria.

04

Improve

Automate high-value regression, remove redundant tests and shorten cycle time.

05

Review and adjust

Regular reviews of service levels, scope and the ramp plan for upcoming releases.

Managed testing versus staff augmentation

Both supply test engineers; the difference is who directs them and what you pay for. With staff augmentation, engineers join your team under your managers and you direct their work. With managed testing, Stalwart runs the team and answers for agreed outcomes. A dedicated engineering team sits between the two, and the engagement models page compares every option.

Managed teams commonly cover automotive testing, embedded software testing and test automation for products with frequent releases.

Toolchains our engineers work with

  • codebeamer
  • dSPACE SCALEXIO
  • GitLab CI
  • Jenkins
  • Jira
  • NI TestStand
  • Polarion
  • pytest
  • TestRail
  • Vector CANoe

Related work

Case studies →

Further reading

All insights →

Frequently asked questions

How does managed testing differ from staff augmentation?

In staff augmentation you direct the engineers and own the outcome; you pay for their time. In managed testing Stalwart directs a team against an agreed scope, service levels and reporting, and you accept results against exit criteria. Managed testing suits recurring release testing; staff augmentation suits filling skill gaps inside your own team.

How quickly can the team scale up for a release?

Lead times are agreed in the service terms and depend on the skills needed, bench access and how familiar engineers already are with your product. Planned peaks are the easiest: sharing the release calendar lets the test lead line up and onboard engineers before the drop. Unplanned peaks are handled through priorities agreed in governance.

Who owns the test assets?

Ownership is set in the contract at scoping. Test cases, scripts, frameworks and results created for you are normally assigned to you and kept in your repositories and ALM. That keeps traceability in your systems and makes a later insourcing or change of provider straightforward.

What governance and reporting do we get?

A named test lead, per-release reports against exit criteria, regular status with defect trends and risks, and periodic reviews of service levels, scope and team size. Escalation paths and change control for scope are agreed at the start. Reporting runs in your ALM, such as Jira, Polarion or codebeamer, so the data stays in your systems.

Can a managed test team work on our benches?

Yes, that is the usual setup. The team works on your HIL rigs, lab instruments and test environments, on site or remotely through a secured connection, with your technicians or our engineers handling hardware changes. If bench capacity is the constraint, HIL test bench setup covers adding benches.

Can we move the team in-house later?

Yes. Because test assets live in your systems, the team can be transferred, converted or wound down at a planned point. For a structured route to your own centre, see Build-Operate-Transfer; for individual conversions, see contract-to-hire.

Does managed testing work for safety-critical programmes?

Yes, provided the test process, independence and tool qualification are defined in your plans. The managed team works to your verification plan and produces evidence in your formats. Where a standard requires independent verification, the team is organised accordingly; see independent verification and validation.

Tell us your domain, standard and team size — get a scoped brief in 2 minutes.